You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Waduk Mini di Ceger Rampung

Small Reservoir Built in Ceger

Small reservoir with an area of 970 square meters on Jl. SMPN 160 RT 02/05 Ceger, Cipayung, East Jakarta which was built since December 2020, has now been completed.

Because their houses are no longer flooded during heavy rains

Ceger Urban Village Head, Suratno mentioned, PPSU personnel are currently finishing retaining walls construction and making inlet-outlet channels, while finishing the bottom part of reservoir thus it can be optimal in overcoming inundation in residential areas.

"Now local residents have felt the results. Because their houses are no longer flooded during heavy rains like before," he conveyed, Wednesday (2/17).

Inundation in Cipinang Melayu has Receded

This reservoir has depth about 1.5-2 meters which is dredged manually by PPSU personnel and Water Resources (SDA) Task Force. It was built on land owned by Jakarta Youth and Sport Agency which located in west side of Ceger Sport Center (GOR)," he informed.

"Alhamdulilah, the small reservoir construction has been completed," he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye985 personAldi Geri Lumban Tobing
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye701 personAldi Geri Lumban Tobing
  3. Bank Jakarta Set to Build Communal Organic Waste Biodigesters

    access_time12-08-2026 remove_red_eye683 personAldi Geri Lumban Tobing
  4. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye670 personAldi Geri Lumban Tobing
  5. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye653 personDessy Suciati